PHASE II ESA
Location: Nashville, Tennessee
Client Type: Consultant
Phase II Environmental Site Assessment. The only access to the boring locations was on a lift gate through the loading dock. Once inside, the crew used a concrete bit to quickly and efficiently hammer through the concrete floor slab at each location and continuously collect soil samples. This work was associated with a real property transfer of a major commercial property in downtown Nashville, Tennessee.